We're about two and a half weeks away from completion at this point. Yesterday, the floor tile was laid. Today, we're getting it grouted. This weekend, we should be able to get in and put a first coat on the bathroom built ins and maybe a second coat in both bathrooms on the walls and ceiling? Will have to check with Norm on that. Don't mind the quality of light in the photos. It was right at the end of the day and we were using the temporary lighting that's installed.
(shower and floor in the bath)
(window seat in the bath)
(powder room)
Kurt also got the first coat of floor paint on the stairs. They're looking mighty spiffy! Not at all like the stairwell of death we used to refer to them as.